
The sequence numbers do not have to be sequential so that space may be left within the set for future additions. The final component of the sheet number is the two-digit sequence number, which is between 01 and 99. Residential Foundation Design Options and Concepts 2012 Instructor: George E. Large Scale Drawings: plans, elevations, sections (NOT details)ģD drawings: isometric, perspective, photos General: Symbol legend, abbreviations, general notes Elevations and sections are a bit more specific and come next followed by details and schedules, which are the most specific type of drawings. In the examples on this page the scale is for 1/4 ins represents 1ft or 1:96 and ArchE refers to a standard US architecture paper size. Since plans are most helpful to see the overall design of the project, they come first. Drawings are always organized from most general to most specific or specialized. The Sheet Types designator takes the drawings of a single discipline and organizes them. The second letter designators can be found in the US National CAD Standards. In this case, a hyphen shall be inserted in place of the secondary discipline designator so that the format remains. National CAD Standard) indicates the primary (single) letter designations that may be used and the order that the disciplines should take. On a small residential project with a few dozen sheets, it is probably easy to have the lighting and power on the same sheet or sequential sheets. For instance, on a complex hospital job with hundreds of sheets, it may be helpful to separate the electrical lighting drawings from the electrical power drawings. Very large or complex projects will want to make use of the double-letter designations to help sub-divide each discipline further. The discipline designator can be a single letter or a double-letter. Therefore, the plumbing contractor can easily take a set of "P" drawings, which has all of the plumbing drawings (plans, schedules, details, etc), and they will not have to sift through the unrelated electrical or structural drawings. Since sheets are distributed to the different sub-contractors in the field, it is helpful for the drawings to be organized by discipline. Revised filing fee (required for the third and all subsequent submissions) - $100.00.The discipline designator helps to identify the type of work that is included on the sheets.Plan revision after approval (phased or altered) - $100.00.Revised filing fee (required for the third and all subsequent submissions) - $250.00.Basic inspection fee - $125.00 + $125.00/acre (do not round area).Revised site plan review and comment period is fifteen (15) working days. Numbering Drawings 0 General notes, legends etc 1 Plans 2 Elevations 3 Sections 4 Enlarged plans, elevations, sections, interior elevations 5.Initial site plan review and comment period is twenty (20) working days.Apply for Site Plans online using the link below. Fill out all documents carefully to be sure that all necessary information is provided on the plans or as part of the submission package. An incomplete submittal can cause significant delays to developments of all scopes and sizes. Incomplete submittal packages will not be accepted or distributed to the Site Plan Review Committee for review and comment. RequirementsĬhecklists are intended to assist the applicant in putting together a complete submittal package.

#RESIDENTIAL BLUEPRINT STANDARD NOTES CODE#
More information is available in Chapter 33.02 – Site Regulations of the Newport News Code of Ordinances.

The type (class) of Site Plan is determined by the scope and details of the proposed project.

A site plan must be submitted for review and approval prior to the construction of any building, the modification of any building, the use of land as a parking lot or the alteration of the grade of any parcel of land.
